We're building the Backbone of Africa's AI Economy.

DST Data Centers is building the continent's most powerful AI compute campus — 1.4GW across 1,000 acres in Lagos, Nigeria.

  • Built for the future
  • Designed for the frontier

Project Endeavour

Built to high-performance U.S. standards to ensure global compatibility.

Provides Africa and global labs long-term control over power and costs.

Modular, parallel construction delivering high-performance compute by late 2026.

Our Deployment Process

01. Site Preparation & Securing

Securing 1,000 acres in Ibeju-Lekki. Establishing behind-the-meter gas supply via aero-derivative turbines. Grid-interconnect redundancy and battery storage commissioned. Dual long-haul fiber routes confirmed.

Major components, electrical switchgear, cooling systems, compute racks, are manufactured off-site and delivered fully integrated. This compresses deployment timelines without sacrificing build quality or scale.


Civil, electrical, and mechanical work runs simultaneously across multiple data halls. Each 1.4MW data-hall module is designed to energize independently, allowing training to begin the moment a module is placed and connected.

Each system is designed to operate independently, allowing new capacity to come online continuously as additional modules roll out in parallel. The result is compounding deployment, not stop-and-wait cycles.

World-class in-house operations team ensuring customer uptime 24×7×365. On-site security operations center. Customizable customer offices, conference rooms, and amenities. Full lifecycle campus management.

  • Site Preparation & Securing
F.A.Q.

Frequently Asked Questions

Q. What is Project Endeavour?
A.

Project Endeavour is a 1,000-acre mega-scale AI data center campus in Ibeju-Lekki, Lagos, Nigeria — Africa's first hyperscale campus specifically designed for next-generation GPU workloads. It will deliver 1.4GW of compute capacity across 10 single-story, liquid-cooled data centers. The first building is scheduled for delivery in H2 2026, with full buildout by 2030.

A.

DST Data Centers partners with AI labs and frontier model developers requiring sustained GPU training capacity, cloud providers and hyperscalers seeking sovereign African infrastructure, and GPU-as-a-Service / Neocloud operators needing ultra-high-density racks from 250kW to 1,000kW per rack.

A.

Ibeju-Lekki offers a rare combination of abundant, low-cost natural gas (adjacent to the Dangote Refinery — world's largest single-train refinery), established logistics infrastructure, dual long-haul fiber routes, and access to Nigeria's eight international submarine cables. It also sits within one of Africa's fastest-growing economic corridors.

A.

Endeavour is a behind-the-meter campus with an on-site natural gas-fired power plant, backup generators, battery storage for load balancing, and grid-interconnect redundancy. N+1 redundancy is maintained across all electrical systems, with a PUE target of nearly 1.0.

A.

Endeavour is pursuing LEED/EDGE, ISO 9001, ISO 14001, ISO 50001, ISO 27001, ISAE 3402 SOC 1 + SOC 2, TÜV Saarland EN50600 VK3, and EMAS. Customer-specific certification can be provided on request.

You Are Here

Let's Start

Initiating Your Journey to Success and Growth.

  • 01 Share your compute requirements
  • 02 Discuss with our infrastructure experts
  • 03 Receive a capacity proposal
  • 04 Secure your capacity
Let's Connect!

Send us a message, and we'll promptly discuss your project with you.